We design, operate, and optimize advanced landfill gas-to-energy systems that transform waste into reliable, clean electricity while reducing greenhouse gas emissions.
Jordan Biogas Company (JBC) is owned by the Greater Amman Municipality (GAM).
Jordan Biogas Company (JBC) is Jordan's first and longest-running landfill gas-to-energy operator. Our journey began in 1998 at the Russifa Dumpsite — Jordan's very first landfill gas power plant — and continued with our current operation at Al-Ghabawi Sanitary Landfill since 2021.
We operate, maintain, and manage landfill gas power plants end-to-end — capturing methane-rich biogas and converting it into 4.68 MW of continuous clean electricity delivered directly to the Greater Amman Municipality.
JBC also delivers full-scope engine maintenance for MWM, Caterpillar, and Jenbacher engines, real-time emissions monitoring (RTMS), and SCADA integration with live Power BI dashboards.
Full-scope operation and maintenance of landfill gas reciprocating engines — from routine inspections to complete A, B, C, and D level overhauls. We maintain MWM, Caterpillar, and Jenbacher engines with in-house certified engineers and technicians.
Real-Time Monitoring Systems for continuous emissions, operational parameters, and environmental compliance. Connected dashboards, alarms, and regulatory reporting for landfill and industrial sites.
Complete LFG capture, treatment, and power generation operations. From wellfield management and gas collection to operating engine power plants that convert waste to clean electricity.
SCADA system programming and HMI development for power plants and process facilities — including integration with live dashboards such as Power BI for real-time operational monitoring and reporting.
Preventive and corrective maintenance contracts, spare parts management, and rapid-response breakdown services. 24/7 on-call coverage with in-house mechanical and electrical technicians.
Jordan's first ever landfill gas power plant, commissioned at the Russifa Dumpsite in 1998. A 2.6 MW facility that established our track record in waste-to-energy and continues operating to this day.
Jordan's flagship landfill gas-to-energy facility, operated by JBC at Al-Ghabawi Sanitary Landfill since 2021. 4 cells, 740 wells, full LFG wellfield O&M, biogas engines, and SCADA supervisory control — delivering 4.68 MW of clean power to the Greater Amman Municipality.
Full Project DetailsContinuous Emissions Monitoring across Al-Ghabawi (Amman), Akider (North Jordan), and Al-Husinyat — real-time emissions data and regulatory compliance reporting for the Ministry of Environment.
Project DetailsJBC's founding project — operating since 1998. Stage 1: Jenbacher engines. Stage 2: MWM Deutz engines with biogas reactor and H₂S removal system. Continuously generating clean power to this day.
Full Project DetailsWhether you need emissions monitoring, engine maintenance, or LFG operations support — our team responds within 24 hours.